Excavation Calculator

Calculate excavation costs and soil removal requirements. Get accurate estimates for digging, hauling, and disposal based on soil type and project size.

āœ“ Free Forever • No Signup Required
šŸ”„ Pricing Updated:

šŸ For Homeowners: Get a quick cost range with just a few measurements. Perfect for budgeting and comparing contractor quotes.

feet
Length of area to excavate
feet
Width of area to excavate
feet
How deep to dig
Soil type dramatically affects difficulty
Typical Excavation Costs by Soil Type
Soil Type$/Cubic YardExpansion FactorDifficulty
Normal Soil (topsoil/loam)$50 – $1001.25ƗStandard
Sandy Soil$45 – $851.15ƗEasy — digs fast, caves easy
Clay Soil$65 – $1301.35ƗModerate — heavy, sticky
Mixed Soil$55 – $1101.30ƗVaries by composition
Rocky Soil$100 – $2201.50ƗHard — may need breaker

Prices are per cubic yard in-place (bank measure). Expanded volume after digging is 15-50% greater depending on soil.

Assumptions & Sources

Assumptions

  • Soil pricing: Based on 2025 national averages for machine-dug residential/commercial excavation, including operator labor.
  • Expansion factor: Soil expands 15-50% once removed from the ground. All haul-off costs use expanded (loose) volume, not bank volume.
  • Haul-off: Not included by default in quick mode. Professional mode prices haul-off at $15-40/cu yd depending on distance. On-site spreading is $0 extra.
  • Equipment rates: Mini excavator $85/hr, standard excavator $125/hr, backhoe $95/hr. Hand digging priced at manual labor rates (~0.5 cu yd/hour).
  • Regional multiplier: ZIP-code-based adjustment using RSMeans 2025 regional cost indices applied to both equipment and labor.

Last updated: February 2026

Pro Tips from a Construction PM
  • Call 811 before you dig — always: A $0 utility locate beats a $15,000 gas line repair. Most states require 3 business days' notice, and hitting an unmarked line is the utility company's problem, not yours.
  • Soil type changes everything: Sandy soil digs fast and cheap. Clay is heavy and sticks to buckets. Rock? That's 2-3Ɨ the cost and you might need a breaker attachment. Get a test hole before you commit to a fixed-price bid.
  • Budget for haul-off separately: Most bids assume on-site spreading, not trucking to a dump. If your site can't absorb the spoils, you're looking at $15-40/cubic yard extra, and dirt expands 25-50% once it's out of the ground.
  • Measure your access: If the excavator can't reach the dig site, you're paying for hand digging at 10Ɨ the cost. Check gate width and overhead clearance before the machine shows up.
  • Dewatering kills budgets: If you hit the water table, a sump pump adds $200, but well points run $800+. Ask around about water table depth in your area before you start.
Related Calculators
  • Concrete Calculator — Estimate concrete volume and cost for footings, slabs, or walls going into your excavation.
  • Foundation Repair Calculator — Calculate foundation repair costs if excavation is for underpinning or drainage remediation.
  • Gravel Calculator — Figure gravel quantities for backfill, base layers, or access roads on your excavation site.